How this model has changed

Every change to TerraPraxis's model, newest first, with its result in years of healthy life per $1,000 at default values.

Result per version, years of healthy life per $1,000 · default values
<0.12026-11-15> −0.12026-11-15<0.12026-11-15<0.12026-11-27
  1. 4 changes to wording, sources or links · 2026-11-17 to 2026-11-27 · no numbers changed
    • Fixes from testing /ai and the MCP server: own models' source links reach their page; llms.txt figures match the other surfaces; MCP answers name the charity's ranked figure and refuse values they'd change; a share link's URL says what is shown; spreadsheet-copy leftovers leave model names · 2026-11-27 · this version
    • Every model page leads with a plain-words story: a sentence, the likely range, the questions that move it and the chain from $1,000 to the result, each number live and proven by npm run check · 2026-11-25 · this version
    • Rule input-domains: every input and shared fact states its kind of number; no headline moved, simulated ranges follow the kinds; 175 receipts re-stamped; rules 0.4.3 · 2026-11-23 · this version
    • Credit step 5a (policy-research-meta, catastrophic-risk, money movers), part 1: branches classed win, research or delivery; shares that counted the adopter re-judged to co-advocates and co-deliverers, each with a scoped verification · 2026-11-17 · this version
  2. Credit that adds up, step 3 (policy-research-meta, catastrophic-risk): win branches read the mobiliser's share at 100%; no headline moves

    2026-11-17 · Christoph Hartmann · This version of the model

    <0.1
    …

    56 models, 194 used shares: 76 already read <branch>_attribution_share_shared and now multiply by mobiliser_share; 118 inputs and compound formulas became <branch>_attribution_share_shared with a used row beside them (text and {{row:}} mentions follow the judged share). Top rows that are averages of the branches read the share through them (17); where they are for reading only, attribution_share_shared averages the co-advocates' shares and attribution_share the used ones.

    By hand: Center for AI Safety's field-building term read attr_other outside the share (new fb_attribution_share); Rewiring America's rebates and tax credits (ira_transfer_uov_per_year, public money net of its payers' cost) read the co-advocates' shares directly and now take the share with the branch; Earthjustice's two reading-only averages.

    Class set where the branch is plainly a law, rule, budget or court order others carry out (68 branches in 37 models: the catastrophic-risk policy branch, the climate rules and credits with a compliance or public cost, named acts and campaigns); the rest are left for the classification step. Compliance and public-cost rows all sit downstream of their branch's used share (INV-22 b).

    Left on the allowlist: the 13 money movers' attribution_share (their skeleton's unused win branch: step 2's models), Project Drawdown's phil_attribution_share (its informed-money branch takes the share through shifted_dollar_value), and every money, spending and career entry. Receipts re-stamped against HEAD, every headline unchanged.

    What changedBeforeAfter
    This charity's share of the good done with money, work or budgets it brings in · added—→100%
    Coal repowering: share of credit used · calculation changed8%, the same number as before
    Advanced nuclear: share of credit used · calculation changed0.6%, the same number as before
    Share of credit used (outcome-weighted average of the lines, for reading only) · calculation changed1%, the same number as before
  3. 5 changes to wording, sources or links · 2026-11-15 to 2026-11-16 · no numbers changed
    • Longview reads every grantee with a model live; typed numbers and peer phrasing caught and fixed · 2026-11-16 · this version
    • Peer mentions removed from the text: animal welfare and climate (no value change) · 2026-11-16 · this version
    • Prose numbers: typed model figures in write-ups and model text become placeholders (re-run on the cleaned tree); receipts re-stamped; last preflight findings waived with reasons (honest spreads, one coincidence); preflight's own shared-fact waiver section · 2026-11-16 · this version
    • After-merge (climate site-wide change): generated/; batch log updated · 2026-11-15 · this version
    • Rule 2.23 verifications: scoped rounds for the eleven changed models, text fixes, re-stamps for the mechanical bridge change · 2026-11-15 · this version
  4. Climate: public money netted against its payers (2.23); damage beyond deaths at EPA's 0.6, a side effect; CATF/TerraPraxis/Industrious Labs/Opportunity Green fix-ups

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1
    What changedBeforeAfter
    Tripling pathway: its base year · added—→2,020
    Tripling pathway: the year it reaches three times 2020's capacity · added—→2,050
    Middle year of the years the work counts · added—→2,000
    Share of the pathway's 2050 build reached by that year · added—→68%
    Coal repowering: expected tonnes before adjustments · calculation changed8.9M→6.1M
    Advanced nuclear: expected tonnes before adjustments · calculation changed80M→55M
    Where the site's discount rate sits between the IEA/NEA's 3% and 7% · calculation changed0.25, the same number as before
    Coal repowering: construction cost saved on reactors moved to coal sites, units of value · calculation changed210→140
    Extra reactors: cost of their power over what it replaces, units of value · calculation changed130→87
    The deployment's money effects, in tonnes of CO₂e · calculation changed89,000→54,000
  5. Wording, sources or links changed · 2026-11-15 · no numbers changed
    • TerraPraxis audit round 5 and fixes: beneficiaries from the model's rows, US and France utility solar in the clean-gap facts, system-cost arithmetic · 2026-11-15 · this version
  6. TerraPraxis audit round 4 and fixes: nuclear's gap over wind and solar from PCGE with a shared system-cost figure, fossil/clean split per region, middle-income builders at China's costs; Clean Air Task Force verification r10 (pass)

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1
    What changedBeforeAfter
    New nuclear power's cost over the wind and solar it replaces, China, at the site's discount rate, system costs included (2018 US$ per MWh) · added—→$-5
    New nuclear power's cost over the wind and solar it replaces, India, at the site's discount rate, system costs included (2018 US$ per MWh) · added—→$9.7
    New nuclear power's cost over the wind and solar it replaces, United States, at the site's discount rate, system costs included (2018 US$ per MWh) · added—→$7.1
    New nuclear power's cost over the wind and solar it replaces, elsewhere, at the site's discount rate, system costs included (2018 US$ per MWh) · added—→$-37
    Construction cost per MWh ÷ payers' consumption, averaged over where the reactors are built · calculation changed0.0057→0.0056
    Overnight cost per kW ÷ payers' consumption, averaged over where the reactors are built · calculation changed0.82→0.81
    CO₂ per MWh of gas power relative to coal power · added—→42%
    Coal's share of the fossil power replaced, China · added—→85%
    Coal repowering: share of the power the extra reactors replace that is fossil, China · added—→55%
    Advanced nuclear: share of the power the new reactors replace that is fossil, China · added—→38%
    Coal's share of the fossil power replaced, India · added—→100%
    Coal repowering: share of the power the extra reactors replace that is fossil, India · added—→50%
    Advanced nuclear: share of the power the new reactors replace that is fossil, India · added—→35%
    Coal's share of the fossil power replaced, the United States · added—→40%
    Coal repowering: share of the power the extra reactors replace that is fossil, the United States · added—→77%
    Advanced nuclear: share of the power the new reactors replace that is fossil, the United States · added—→54%
    Coal's share of the fossil power replaced, elsewhere · added—→50%
    Coal repowering: share of the power the extra reactors replace that is fossil, elsewhere · added—→70%
    Advanced nuclear: share of the power the new reactors replace that is fossil, elsewhere · added—→49%
    Coal repowering: cost gap per MWh ÷ payers' consumption, averaged over where the reactors are built · added—→1.8 × 10⁻⁵
    Advanced nuclear: cost gap per MWh ÷ payers' consumption, averaged over where the reactors are built · added—→2.0 × 10⁻⁴
    Extra reactors: cost of their power over what it replaces, units of value · calculation changed370→130
    Cost gap per MWh ÷ payers' consumption, averaged over where the reactors are built · removed-0.0011→removed
    CO₂ per MWh of the fossil power replaced, relative to coal · removed85%→removed
    Coal repowering: share of the power the extra reactors replace that is fossil · removed59%→removed
    and 2 more
  7. TerraPraxis audit round 3 and fixes: nuclear cost gaps at the site's discount rate (PCGE 3%/7%), fossil comparator by generation and clean power's share, coal-site saving on extras, regional overnight costs, 2018 dollars, middle-income builders, other work on the net; Clean Air Task Force reads the same US gap (verification r9 on the previous step)

    2026-11-15 · Christoph Hartmann · This version of the model

    > −0.1 → <0.1
    What changedBeforeAfter
    Share of the new reactors built in other middle-income countries (Türkiye, Egypt, newcomers) · added—→10%
    Share of the new reactors built elsewhere (Europe, Korea, Japan, Russia) · calculation changed30%→20%
    Where the site's discount rate sits between the IEA/NEA's 3% and 7% · added—→0.25
    New nuclear power's cost over the fossil power it replaces, China, at the site's discount rate (2018 US$ per MWh) · added—→$1.6
    Construction cost in each MWh of new nuclear power, China, at the site's discount rate (2018 US$ per MWh) · added—→$17
    New nuclear power's cost over the fossil power it replaces, India, at the site's discount rate (2018 US$ per MWh) · added—→$-5.8
    Construction cost in each MWh of new nuclear power, India, at the site's discount rate (2018 US$ per MWh) · added—→$19
    New nuclear power's cost over the fossil power it replaces, United States, at the site's discount rate (2018 US$ per MWh) · added—→$10
    Construction cost in each MWh of new nuclear power, United States, at the site's discount rate (2018 US$ per MWh) · added—→$30
    New nuclear power's cost over the fossil power it replaces, elsewhere, at the site's discount rate (2018 US$ per MWh) · added—→$-14
    Construction cost in each MWh of new nuclear power, elsewhere, at the site's discount rate (2018 US$ per MWh) · added—→$21
    Payers' 1 ÷ consumption, averaged over where the reactors are built · added—→3.0 × 10⁻⁴
    Cost gap per MWh ÷ payers' consumption, averaged over where the reactors are built · added—→-0.0011
    Construction cost per MWh ÷ payers' consumption, averaged over where the reactors are built · added—→0.0057
    Overnight cost per kW ÷ payers' consumption, averaged over where the reactors are built · added—→0.82
    CO₂ per MWh of the fossil power replaced, relative to coal · added—→85%
    Coal repowering: share of the power the extra reactors replace that is fossil · added—→59%
    Advanced nuclear: share of the power the new reactors replace that is fossil · added—→41%
    New nuclear power's cost over the clean power it replaces (2018 US$ per MWh) · added—→$0
    Coal repowering: construction cost saved on reactors moved to coal sites, units of value · calculation changed310→210
    Extra reactors: cost of their power over what it replaces, units of value · calculation changed-1,200→370
    Tonnes of CO₂e averted per year of the period · calculation changed-200,000→200,000
    Payers' 1 ÷ consumption, averaged over where the reactors are built · removed2.8 × 10⁻⁴→removed
    Extra cost per MWh ÷ payers' consumption, averaged over where the reactors are built · removed0.0036→removed
  8. TerraPraxis round-2 fixes: money valued at payers' consumption by region (new China/India survey-scale facts), regional nuclear premiums from IEA/NEA PCGE 2020 as shared facts (also read by Clean Air Task Force's nuclear branch: 0.0045 -> 0.0036), gas supply methane, wider credit ranges, coal-capacity shares sourced

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1 → > −0.1
    What changedBeforeAfter
    Coal repowering: tonnes of CO₂e a year the re-powered plants would avert if each replaced coal · calculation changed218,747,100→230,455,987
    Advanced nuclear: tonnes of CO₂e a year those reactors would avert if each replaced coal · calculation changed1,968,723,899→2,074,103,882
    Methane from gas supply, in CO₂e, per tonne of CO₂ from burning gas · added—→0.14
    CO₂e of the displaced power's supply methane, per tonne of its CO₂ · added—→0.1
    Share of the new reactors built in China · added—→45%
    Share of the new reactors built in India · added—→10%
    Share of the new reactors built in the United States · added—→15%
    Share of the new reactors built elsewhere (Europe, Korea, Russia, newcomers) · added—→30%
    Consumption per person of those who pay for power, China (survey scale, 2024 US$) · added—→$4,200
    Consumption per person of those who pay for power, India (survey scale, 2024 US$) · added—→$630
    Consumption per person of those who pay for power, United States (survey scale, 2024 US$) · added—→$33,000
    Consumption per person of those who pay for power, elsewhere (survey scale, 2024 US$) · added—→$27,000
    Payers' 1 ÷ consumption, averaged over where the reactors are built · added—→2.8 × 10⁻⁴
    Extra cost per MWh ÷ payers' consumption, averaged over where the reactors are built · added—→0.0036
    Coal repowering: construction cost saved on reactors moved to coal sites, units of value · calculation changed34→310
    Extra reactors: cost of their power over what it replaces, units of value (negative at the best guess) · calculation changed-91→-1,200
    Share of these tonnes that are methane · calculation changed4.4%→9.3%
    Overnight cost of building an advanced reactor, per kW (2022 dollars) · removed$5,000→removed
    Extra cost of the extra reactors' power over the power it replaces, per MWh (2022 dollars) · removed$10→removed
  9. TerraPraxis: audit round 2 (fix needed: money branch valued at US payers, premium unanchored); low fixes (fuel share net of methane, unsourced claims dropped, CIC note)

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1
    What changedBeforeAfter
    Share of these tonnes from burning less fossil fuel near people · calculation changed100%→96%
  10. TerraPraxis: audit round 1 and its fixes (coal sites as a share of the build, enabling share 1.5%, money effects through the bridge, smoke from coal and gas, mine methane, UK sister's costs, country shares)

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1
    What changedBeforeAfter
    Spending of the UK sister company, TerraPraxis CIC, a year (US dollars) · added—→$60,000
    Cost of the modelled programmes, including overhead and the UK sister company, 2024 · calculation changed$2M→$2.1M
    Share of the new reactors built by about 2050 that stand on coal sites · added—→10%
    Coal repowering: tonnes of CO₂e a year the re-powered plants would avert if each replaced coal · calculation changed530,337,969→218,747,100
    New nuclear capacity built on the tripling pathway · added—→270
    Coal repowering: gigawatts of new reactors on coal sites · calculation changed70→27
    Advanced nuclear: gigawatts built away from coal sites · calculation changed200→250
    Advanced nuclear: tonnes of CO₂e a year those reactors would avert if each replaced coal · calculation changed1,560,534,712→1,968,723,899
    Share of the displaced tonnes that are coal's (the rest gas's) · added—→60%
    Methane from coal mining, in CO₂e, per tonne of CO₂ from burning coal · added—→0.077
    Share of the deployment due to the period's enabling work (all non-commercial groups together)4%→1.5%
    Overnight cost of building an advanced reactor, per kW (2022 dollars) · added—→$5,000
    Share of a reactor's construction cost saved by reusing a coal site · added—→25%
    Coal repowering: construction cost saved on reactors moved to coal sites, units of value · added—→34
    Extra cost of the extra reactors' power over the power it replaces, per MWh (2022 dollars) · added—→$10
    Extra reactors: cost of their power over what it replaces, units of value (negative at the best guess) · added—→-91
    Money effects of the deployment, units of value per year of the period · added—→-19
    Air-pollution deaths per tonne of coal power displaced in the 2040s, relative to the fossil-fuel average · added—→0.22
    Air-pollution deaths per tonne of gas power displaced, relative to the fossil-fuel average · added—→0.039
    Air-pollution deaths per tonne of these fuel tonnes, relative to the fossil-fuel average · calculation changed0.14→0.15
    Share of these tonnes that are methane · calculation changed0%→4.4%
    The deployment's money effects, in tonnes of CO₂e · added—→-15,000
    Tonnes of CO₂e averted per year of the period · calculation changed150,000→21,000
    Fees for management and consulting services, 2024 · added—→$820,000
    Staff and staff-like consultants' pay as a share of cost · calculation changed53%→94%
    and 1 more
  11. TerraPraxis: our own build (coal repowering and advanced nuclear, 2022-2024 past average); donate link to its own page

    2026-11-15 · Christoph Hartmann · This version of the model

    <0.1

    First version: 69 rows.